From a point on a scaffold over the waterway, the edge of dejection of the banks on inverse sides of the waterway is 30°and 45°respectively. In the event that the scaffold is at tallness of 2.5m from the banks, find the width of the Stream. (Take √3=1.732)
Answer: B
No answer description available for this question.